link to Talbot Project home page link to De Montfort University home page link to Glasgow University home page
Project Director: Professor Larry J Schaaf
 

Back to the letter search >

Result number 1 of 6:   < Back     Back to results list   Next >  

Document number: 6043
Date: 08 Nov 1847
Recipient: TALBOT William Henry Fox
Author: GALE John
Author 2: BANKS George
Collection: British Library, London, Manuscripts - Fox Talbot Collection
Last updated: 22nd March 2012

Lacock Novr 8th 1847

Sir/

The Bridge No 8 at Wick Farm, is built according to the dimensions shown on the drawing but is not completed the Parapets being yet to be built Wing Walls to be finished and coping to be put on

The Bridge No 3 is according to the drawing, except being 3 Inches lower when I saw it last Month the Arch was 17 ft 9 In high, but it has since been lowered 1 foot which brings it 3 Inches under the dimensions given in the drawing

The other dimensions as far as I can ascertain are correct. This Bridge, as well as No 5. has yet to have the Coping put on the Wing Walls and Parapets

All the Bridges are built with good Materials, and in a strong and Workmanlike manner.

John Gale
George Banks.

To/
W H F Talbot Esqr
Lacock Abbey

Result number 1 of 6:   < Back     Back to results list   Next >